1345/1477
Wall surface would be the first priority, then sealign the concrete floor, followed by repainting.
There are other isues too, like the timbers, and an odd cavity that exists where the wooden wall meats the basement outer.
- Created on
- Friday 26 February 2021
- Posted on
- Sunday 12 September 2021
- Visits
- 883