Basement food cellar work, the big concrete pour, and making a gravel path between the house and garage.
- Added insulation to basement wall within cold/food cellar
- Stonewool
- Still snow
- Ready for the pour
- ready for pour
- Preparing for the pour
- Still snowing
- Aftermath
- Unflattened fresh pour
- IFed up of mud
- Removing turf and old groundsheet
- New groundsheet
- Summer adventure
- Thinning hedges
- Hills and lakes in the snow
- Deer pack
- beautiful weather
- Joining entryway slab detail
- Not as deep as I had hoped
- More birds
- Birds
- Helicopter with tree cutting blades beneath
- IMG-20210418-WA0003
- IMG-20210402-WA0018